Notes:
001. ENERGY STAR / GREEN BUILDING.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
000. EXTERIOR BEAMS 10" X 34"D.
010. INTERIOR BEAMS=10"W X 28"D.
026. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
032. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
036. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
039. RESIDENTIAL STUCCO REQUIRES LATH & EXPANDED WIRE MESH WITH CEMENT PLASTER.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
046. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
2nd FLOOR: 4-BED ROOMS, 2-BATHS & GAME ROOM.
THIS PERMIT WILL BE RELEASED AS SOON AS WE GET A CORRECTED PLOT PLAN AND E-STAR REM RATE.
3774 AC, 4428 SF, SFR / 2 STORY