Notes:
SALT / SOLAR PV SYSTEM
9/17/2010 12:00:00 AM
(9/17/2010 9:33 AM JM)
ALL WIRING METHODS AND PV INSTALLATION MUST COMPLY WITH ART. 690 2005 NEC.
ALL FRAMING SHALL COMPLY WITH 2006 IRC.
1. ALL WORK MUST BE INSPECTED BY A CITY INSPECTOR.
2. ENGINEER MAY BE REQ'D. TO VERIFY AN INSPECTION BASED ON ROOF SUPPORT SYSTEM FOR NEW ARRAY PANELS. AND PROVIDE A FINAL ACCEPTANCE LETTER AT FINAL INSPECTION.
3. INSTALLATION MUST COMPLY WITH MANUFACTURERS INSTRUCTIONS AND ART. 690 OF 2005 NEC.
4. PLANS TO REMAIN ON SITE THROUGHOUT INSTALLATION.
5. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS SUBMITTAL.