Notes:
SALT / FIRE RESTORE
9/14/2010 12:00:00 AM
FIRE RESTORATION
A LIST OF INSPECTIONS HAS BEEN GIVEN TO CONTRACTOR......SAM ROGERS WITH SRT.
001. ENERGY STAR / GREEN BUILDING.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
031. SIDING DIRECTLY OVER MASONRY AT SECOND STORY IS NOT ALLOWED.
034. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
035. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
044. CO DETECTORS REQ'D ON ELECTRICAL LEGEND & ELECTRICAL PLAN 1/1000 SQ. FT. & 1 PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR.
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
055. FUEL BURNING HOT WATER HEATER INSTALLATION MUST BE CODE COMPLIANT.
060. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
A. ENERGY STAR////////GREEN BLDG. ORD. REQ'D.
B. THERMAL BYPASS INSPECTIONS REQ'D.
C. EOR INSPECTION REQ'D. AT INITIAL FRAME AND A FINAL ACCEPTANCE LETTER SUBMITTED AT C/O.
D. BOND ALL METAL FLUE/EXHAUST DUCTS.
E. ALL CONTRACTORS SHALL BE REGISTERED.
F. GENERAL CONTRACTOR SHALL FINAL THE DEMO PERMIT B10-1874 [MISC. BLDG. FINAL] FOR CITY RECORDS TO BE COMPLETE.
G. PLBG. FIXTURES SHALL BE REPLACED.
H. 3 NEW A/C UNITS TO BE INSTALLED.