Notes:
(9/13/2010 9:40 AM JM)
1. ALL WORK MUST BE INSPECTED BY A CITY INSPECTOR.
2. ENGINEER MAY BE REQ'D. TO VERIFY AN INSPECTION BASED ON ROOF SUPPORT SYSTEM FOR NEW ARRAY PANELS. A COPY OF ENGINEER OF RECORD IS ATTACHED.
3. INSTALLATION MUST COMPLY WITH MANUFACTURERS INSTRUCTIONS AND ART. 690 OF 2005 NEC.
4. PLANS TO REMAIN ON SITE THROUGHOUT INSTALLATION.
800 SQ FT, SALT / SOLAR PV SYSTEM