Notes:
/PATIO COVERS:
• PATIO COVERS SHALL COMPLY WITH THE CURRENT IRC APPENDIX H.
• 1. CITY APPROVED PERMIT SET MUST REMAIN ON SITE THROUGHOUT CONSTRUCTION.
• 2. EACH PHASE OF CONSTRUCTION SHALL BE FIELD APPROVED BY CITY OF FRISCO INSPECTOR.
• 3. FRAMING/FASTENING SHALL COMPLY WITH THE 2006 IRC TABLE 602 AND APPENDIX H.
• 4. METHOD OF ATTACHMENT MUST BE INSPECTED AND VISIBLE TO INSPECTOR WHERE LEDGER BOARD IS ATTACHED TO BRICK WALL. A 3/8" X 9" LAG OR GKS SCREW IS REQ'D. THIS WILL ALLOW PENETRATION THRU BRICK AND INTO EXISTING VERTICAL STUD BY
• 1 1/2". THIS MUST BE VERIFIED.
110 SQ FT ARBOR / SALT