Notes:
192 SQ FT PATIO COVER
7/7/2010 12:00:00 AM
16' X 12' SOLID ROOFED PATIO COVER
1. ALL WORK SHALL CONFORM TO LOCAL ADOPTED I-CODES AND LOCAL AMENDMENTS.
2. EACH PHASE OF WORK SHALL BE INSPECTED.
3. THE ATTACHMENT METHOD MUST BE OPEN [VISIBLE] FOR THE INSPECTOR.
4. PATIO COVERS SHALL COMPLY WITH THE CURRENT IRC APPENDIX H.
5. CITY APPROVED PERMIT SET MUST REMAIN ON SITE THROUGHOUT CONSTRUCTION.
6. FRAMING/FASTENING SHALL COMPLY WITH THE 2006 IRC TABLE 602 AND APPENDIX H.
7. METHOD OF ATTACHMENT MUST BE INSPECTED AND VISIBLE TO INSPECTOR WHERE LEDGER BOARD IS ATTACHED TO BRICK WALL. A 3/8" X 9" LAG OR GKS SCREW IS REQ'D. THIS WILL ALLOW PENETRATION THRU BRICK AND INTO EXISTING VERTICAL STUD BY
1 1/2". THIS MUST BE VERIFIED.