Notes:
FIRE RESTORATION
INSPECTIONS REQ'D. BUT NOT ALL INCLUSIVE:
PLBG. TOP OUT
ELECT. ROUGH
PLBG. FINAL
MISC. FRAME
INSULATION
DRYWALL
ELECT. FINAL
PLBG. FINAL
MISC. BLDG. FINAL
SOME OF THESE INSPECTIONS CAN BE DONE SIMULTANEOUSLY; ONLY UPON THE INSPECTORS DISCRETION.
(5/10/2010 1:45 PM JM)
1. ALL WORK SHALL COMPLY WITH CURRENT CODES AND ADOPTED AMENDMENTS.
2006 IRC
2005 NEC
2006 IPC
2006 IMC
NO THIRD PARTY ENGINEER IS REQ'D.
2. ALL WORK SHALL BE FIELD APPROVED BY A CITY INSPECTOR.
3. ANY QUESTIONS RELATING TO INSPECTIONS CAN BE VIEWED ON OUR WEBSITE @ www.cityoffriscotexas.gov
4. ALL SMOKIES AND CARBON MONOXIDE DETECTORS SHALL BE HARD WIRED AND INTERCONNECTED. 1 SMOKE ON THE FIRST LEVEL [ONE AT HALLWAY ENTRY TO BDRMS. 2ND LEVEL].
WITH ONE IN EACH BDRM. CARBON MONOXIDE DETECTORS EACH 1000 SQ. FT. 2 UPSTAIRS AND 1 DOWN.
5. ALL CONTRACTORS SHALL BE REGISTERED.
6. A ROLL OFF SKID THROUGH CHAMPION SERVICES SHALL BE ON SITE.
7. A COPY OF INSURANCE CLAIM SHALL REMAIN ON SITE, THERE SHALL BE SOMEONE AT THE HOME TO ALLOW THE INSPECTOR ENTRY.
8. ELECTRICAL METER WAS NOT PULLED, ELECTRICIAN SHALL TRACE EACH CKT.
9. TWO NEW HVAC UNITS WILL BE INSTALLED IN THE ATTIC MINIMUM OF 13 SEER. COMPLIANCE WITH GREEN BLDG. ORDINANCE IS REQ'D. FRESH AIR BROUGHT IN FROM THE EXTERIOR; AND ONE AT EACH HALLWAY ENTRY TO BDRMS. TWO DAMPERS [MANUAL AND AUTOMATIC] ARE REQ'D. FOR EACH HVAC SYSTEM THAT SUPPLIES A/C TO BDRMS.
10. BOND ALL METAL FLUES THAT PENETRATE THE ROOF AND BACK TO THE ELECTRICAL PANEL.
3400 AC, 3800 SF, SALT / FIRE DEMO & RESTORE