Notes:
1. ALL WORK SHALL COMPLY WITH 2006 IRC AND BE FIELD INSPECTED.
2. FIRST FLOOR FACADE MATERIAL SHALL BE 100% MASONRY WHICH INCLUDES [BRICK, STONE OR STUCCO]. NO SIDING.
3. LAG SCREWS SHALL BE 9" TO 10" LONG TO PENETRATE EXISTING VERTICAL WALL STUDS. MASONRY IS NOT DESIGNED TO CARRY EXTRA DEAD LOAD DUE TO 90 MPH 3 SECOND WIND GUST.
4. BOLT SILL PLATE TO SLAB WITH 1/2" X 7" J-BOLT @ 6' ON CENTER.
5. ELECTRICAL SHALL COMPLY WITH 2005 NEC AND CONDUCTORS SHALL BE PROTECTED FROM PHYSICAL DAMAGE.
6. WITH ADDITION BUILT AROUND MASTER BDRM. ALWAYS MAINTAIN CLEAR PATH OF EMERGENCY EXITING BDRMS. [THRU WINDOW AND THRU PERSONAL PASSAGE DO
193 SQ FT, SALT / GREENHOUSE