Notes:
THIS WORK WAS STARTED W/O A PERMIT.
THIS IS WARRANTY WORK BUT DOES INVOLVE BRICK REPLACEMENT.
1. A BRICK INSPECTION IS REQ'D.
2. THERE WAS NO INSULATION FOUND AT THE 2ND STORY INTERIOR WALL. THAT MUST BE SET IN PLACE.
3. BEFORE THE LINTEL IS PLACED OVER THE BOX OUT WINDOW AT THE KITCHEN AN INSPECTION MUST BE PERFORMED.
4. ALL WORK MUST COMPLY WITH THE 2006 IRC.
5. VERTICAL WALL STUDS BELOW MUST BE FLASHED AND SEALED PROPERLY BEFORE ANY BRICK IS SET. THESE WALL STUDS SHALL SUPPORT THE INTENDED DEAD LOADS.
6. MY RECOMMENDATION IS THAT THE BRICK BE REMOVED AROUND THE BOX OUT WINDOW TO ENSURE PROPER KING AND TRIMMER STUDS ARE PRESENT TO SUPPORT BRICK LOAD ABOVE. THERE WAS NO TRIPLE GREEN PRESENT OVER THE BOX OUT WINDOW. THE REASON FOR THE REMOVAL OF THE 2ND FLOOR BRICK WAS BECASUE THE OWNER AND CONTRACTOR AGREED THAT THE BRICK BEGAN TO SAG AND PULL AWAY FROM THE WALL.
WARRANTY REPAIR-BRICK-WINDOW