Notes:
4088 AC, 4765 SF, SFR / 2 STORY
9/30/2009 12:00:00 AM
001. ENERGY STAR / GREEN BUILDING.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
010. BEAMS=10"W X 28"D.
020. W/12" DIA. PIERS W/(1) #5 REBAR.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
033. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
037. DRIVEWAY SLOPE MUST NOT EXCEED 12% - PLOT PLANS W/GRADES REQUIRED.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(9/30/2009 09:15 JC)
Pier Concrete - 2500 psi @ 56 days ??? Slab Concrete - 3000 psi @30days ?