Notes:
220 SQ FT, SADD / PATIO COVER
8/25/2009 12:00:00 AM
ALL WORK PERFORMED MUST MEET THE 2006 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
* NO PLUMBING PERMIT REQUESTED OR ISSUED ***
* FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED. ***
* OUTSIDE OF POST CAN NOT ENCROACH THE 20' REAR BUILDLINE.
* OUTSIDE OF POST CAN NOT ENCROACH THE 7' SIDE YARD SETBACKS.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
INSPECTIONS REQ'D:
ELECTRICAL ROUGH / MISC FRAME
MISC BUILDING FINAL
**** R905.2.2 Slope. Asphalt shingles shall be used only on roof slopes of two units vertical in 12 units horizontal (2:12) or greater. For roof slopes from two units vertical in 12 units horizontal (2:12) up to four units vertical in 12 units horizontal (4:12), double underlayment application is required in accordance with Section R905.2.7.
CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.