Notes:
182 SQ FT, SADD/ PATIO COVER W/ ELEC
8/13/2009 12:00:00 AM
* ALL WORK PERFORMED MUST MEET THE 2006 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
* OUTSIDE OF POST CAN NOT ENCROACH THE 12' REAR YARD SETBACK.
* OUTSIDE OF POST CAN NOT ENCROACH THE 7' SIDE YARD SETBACK.
*** NO PLUMBING PERMIT REQUESTED OR ISSUED ***
*** FIREPLACE, FIRE PIT, OUTDOOR KITCHEN NOT REQUESTED OR PERMITTED.
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
INSPECTIONS REQ'D:
ELECTRICAL ROUGH
MISC BUILDING FINAL / ELEC FINAL
*** R905.2.2 Slope. Asphalt shingles shall be used only on roof slopes of two units vertical in 12 units horizontal (2:12) or greater. For roof slopes from two units vertical in 12 units horizontal (2:12) up to four units vertical in 12 units horizontal (4:12), double underlayment application is required in accordance with Section R905.2.7.
CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.