Notes:
380 SQ FT, SALT / CONCRETE PATIO
5/1/2009 12:00:00 AM
1. * ALL WORK PERFORMED MUST MEET THE 2006 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
2. *** NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED ***
3. *** ARBOR, PATIO COVER, FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED.
4. * CONCRETE PATIO MUST BE ONE (1') FOOT FROM REAR PROPERTY AND ONE (1') FOOT FROM SIDE PROPERTY LINES.
5. ***STONE WALL CANNOT ENCROUCH ON 5' UTILTY EASEMENT.
6. ***STONE COLUMN CANNOT ENCROUCH ON 5' UTILITY EASEMENT.
7. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
8. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
*** OWNER WILL BE RESPONSIBLE FOR ANY EXPENSES FOR PROPERTY DAMAGE BUILT IN THE UTILITY EASEMENT.
CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOME OWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS