Notes:
1. ALL WORK SHALL BE FIELD VERIFIED AND TESTED.
2. R905.2.7 DOUBLE UNDERLAYMENT OF FELT REQ'D.
3. ELECTRICAL SCOPE OF WORK SHALL INCLUDE CEILING FAN AND LIGHT KIT.
4. FOOTER INSPECTION REQ'D.
Electrical Ordinance 08-01-10
THESE ARE GENERAL NOTES; ITEMS CAN BE VERIFIED IN THE FIELD.
001. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
002. ONLY ALUMINIM WIRE PERMITTED IS SERVICE ENTRANCE AND FEEDERS 1/0 AND LARGER STABIL-ALLOY SERIES 6000 & 8000.
003. PULL EQUIPMENT GROUNDS IN ALL RACEWAYS.
006. ALL ELECTRICAL INSTALLATIONS WILL BE SUBJECT TO FIELD INSPECTIONS AND INSPECTOR APPROVALS.
007. ELECTRICAL WILL BE DESIGNED AND INSTALLED PER THE 2005 NATIONAL ELECTRICAL CODE WITH LOCAL AMENDMENTS STATED IN CITY OF FRISCO ORDINANCE ALONG WITH THE FOLLOWING COMMENTS.
010. ALL EXTERIOR LIGHTING SHALL COMPLY WITH COMPREHENSIVE ZONING ORDINANCE ARTICLE IV SECTION 6 LIGHTING & GLARE RQ'MENTS.
011. AN AS-BUILT LEGIBLE PANEL SCHEDULE SHALL BE AFFIXED TO THE INSIDE OF ELECTRICAL PANELS FOR EACH TENANT.
204 SQ FT, CADD / KWIK KAR AUTO CENTER