Notes:
2555 AC, 3005 SF, SFR / 1 STORY
3/16/2009 12:00:00 AM
001. ENERGY STAR / GREEN BUILDING.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
004. BEAMS=8"W X 24"D.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
034. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
038. RETAINING WALLS TWO (2) FT OR TALLER MUST BE OF ENGINEERED DESIGN.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
046. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
060. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
(3/16/2009 13:44 JC)
(FWF)
*****(6/13/2011 10:09 AM MAC) PERMIT RE-ISSUED. CONTRACTOR NAME CHANGED WITH WRITTEN AGREEMENT THAT ALL REMAINING INSPECTION(S) WILL BE COMPLETED INCLUDING ALL OUTSTANDING OR PREVIOUSLY FAILED INSPECTIONS, AND OF ACCEPTANCE OF ALL WORK COMPLETED TO DATE AND THAT ALL WORK FORWARD WILL BE IN COMPLIANCE WITH CITY CODES AND ORDINANCES.