Notes:
1. WORK STARTED WITHOUT PERMIT
2. SIDING MUST BE REMOVED. 100% MASONRY REQ'D. AN OPTION WOULD BE STUCCO.
3. ALL WORK IS SUBJECT TO FIELD APPROVED INSPECTIONS.
4. SLAB HAS ALREADY BEEN POURED WITHOUT AN INSPECTION.
5. THESE INSPECTIONS MUST BE COMPLETED TO RECEIVE A BLDG. FINAL.
6. RECOMMENDATION----BRICK LEDGE NEEDED FOR STONE.
ELECT. ROUGH
FRAME
SHEATHING
LATHE
BRICK
INSULATION
DRYWALL
MISC. BLDG. FINAL
45 SQ.FT. STORAGE CLOSET/END OF SINGLE GARAGE