Property shall be subject to the following inspections:
1. Plumbing Final; Gas system shall be on test to release gas to franchise utility for connection of service. At the time of Plumbing Final Inspection, all fixtures shall be working properly with water turned on.
2. Electrical Final; Panel shall be open to verify all terminations and bonding system.
Complete both above inspection prior to requesting C of O inspection.
3. Certificate of Occupancy / Mechanical Final, will both be completed at same time. Gas service connection shall be obtained and all appliances working order prior to inspection.
***If correction to be made are found for the trades of mechanical or electrical systems, contractor at that time shall ensure they get listed on the permit as the contractor of record. Permit shall be reprinted with new contractors prior to reinspections.
***Plumbing contractor must register prior to permit issuance.
Contact Gilbert Urvina (972) 670-4359, if not available contact Michael Crain (972) 670-4445 directly for all inspection request.
No new construction or renovation activities being performed. No registration of Keller Williams or Chase Bank required.
*** Gas to cooktop ran on exterior added to this permit on 2/2/09