Notes:
3000 AC, 3894 SF, SFR / 2 STORY
12/16/2008 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. BEAMS=10"W X 30"D.
24. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
26. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
35. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN.
49. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
50. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
56. LETTERS OF ACCEPTANCE REQUIRED FROM BOTH ENGINEERS FOR CO.
60. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.