Notes:
4505 AC, 5428 SF, SFR / 2 STORY
8/8/2008 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
10. BEAMS=10"W X 28"D.
20. W/12" DIA. PIERS W/(1) #5 REBAR.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
42. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
49. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
50. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(8/8/2008 10:50 JC)
Note: Plans indicate 10" x 28" grade beams, found. cal's. indicate 8" x 26" beams? Piers are indicated in this design as 2500 PSI at 56 days. All other E.O.R. pier design by other Engineers indicate a min. of 3000 PSI at 28 days.