Notes:
225 SQ FT, SADD / GROUND LEVEL TRAMPOLINE
4/28/2008 12:00:00 AM
1. SUMP PUMP SHALL BE ON GFI BREAKER OR GFI PLUG.
2. PULL # 10 EQUIPMENT GROUND BACK TO PANEL FOR SUMP PUMP CKT.
3. BOND FRAME OF TRAMPOLINE BACK TO ORIGINAL GROUND ROD WITH # 8 SOLID COPPER CONDUCTOR WITH INDIVIDUAL CLAMPS AT EACH LOCATION.
DO NOT CREATE A PARALLEL PATH TO GROUND WITH THIS INSTALLATION.
4. PROVIDE COPY OF OSHA SHORE STANDARDS FOR INSPECTOR. ONLY INDUSTRIAL AND COMMERCIAL SPECS ARE SHOWN FOR SHORING ONLINE.
5. ALL ELECTRICAL INSTALLATIONS SHALL COMPLY WITH NEC 2005.
6. ALL WORK SUBJECT TO FIELD INSPECTIONS AND TESTING.
7. SLIDING GATE SHALL BE A MINIMUM OF 3' FROM PROPERTY LINE.