Notes:
4209 AC, 4876 SF, SFR / 2 STORY
4/16/2008 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. BEAMS=10"W X 30"D.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
33. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
36. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
37. DRIVEWAY SLOPE MUST NOT EXCEED 12% - PLOT PLANS W/GRADES REQUIRED.
49. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
50. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
60. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
(4/16/2008 08:28 JC)
Piers : 12" dia., belled to 36" dia., with (2) #5 vertical rebar.
(5/22/2009 14:28 MAC)
PERMIT RE-ISSUED. CONTRACTOR NAME CHANGED WITH WRITTEN AGREEMENT THAT ALL REMAINING INSPECTION(S) WILL BE COMPLETED INCLUDING ALL OUTSTANDING OR PREVIOUSLY FAILED INSPECTIONS, AND OF ACCEPTANCE OF ALL WORK COMPLETED TO DATE AND THAT ALL WORK FORWARD WILL BE IN COMPLIANCE WITH CITY CODES AND ORDINANCES.