Notes:
822 A/C SFR FIRST & 2ND FLR AREA, 312 SQ.FT. OUTDOOR PATIO
12/6/2007 12:00:00 AM
--------------------CONTRACTOR READ THIS PLACARD PLEASE!
01. ENERGY STAR / GREEN BUILDING------new portion only
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. BEAMS=10"W X 30"D--------------12" diameter helical piers-----pier inspection req'd.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
28. TEMPERED GLASS REQ'D AT WINDOW ADJ TO STAIR.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
34. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
36. REM-RATE REPORT MUST INCLUDE OUTSIDE FRESH AIR REQUIREMENT.
42. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
44. CO DETECTORS REQ'D ON ELECT LEGEND & ELECT PLAN 1/1000 SQ FT & 1 PER FLOOR MIN PLUS (1) ADD'L AT GARAGE ENTRY IN AC AREA.
49. INSPECTIONS, TESTING, COMPONENT VERIFICATION AND FINAL HERS SCORE BY THE THIRD PARTY RATER PROVIDING THE REM-RATE REPORT.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
57. AUTOMATIC FIRE PROTECTION SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL-----PER LETTER FILED WITH CITY PERMIT.
60. BUILDER CAUTION: CONSTRUCTION NOT CONFORMING TO THE ABOVE PERMIT REQUIRMENTS COULD RESULT IN C.O. DELAY OR POSSIBLE DENIAL.
FIRST FLOOR ADDITION WILL INCLUDE BDRM. & BATH----OUTDOOR KITCHEN.
2ND FLOOR ADDITION WILL INCLUDE EXERCISE RM. & STOR. RM.