Notes:
2722 AC, 3358 SF, SFR / 2 STORY
5/7/2007 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
09. BEAMS=10"W X 26"D.
24. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
42. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
49. INSPECTIONS, TESTING, COMPONENT VERIFICATION AND FINAL HERS SCORE BY THE THIRD PARTY RATER PROVIDING THE REM-RATE REPORT.
50. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
51. WINDOW BOX-OUTS MUST NOT EXCEED TWICE THE WINDOW M.O. AREA.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(9/18/2009 09:00 MAC)
PERMIT RE-ISSUED. CONTRACTOR NAME CHANGED WITH WRITTEN AGREEMENT THAT ALL REMAINING INSPECTION(S) WILL BE COMPLETED INCLUDING ALL OUTSTANDING OR PREVIOUSLY FAILED INSPECTIONS, AND OF ACCEPTANCE OF ALL WORK COMPLETED TO DATE AND THAT ALL WORK FORWARD WILL BE IN COMPLIANCE WITH CITY CODES AND ORDINANCES.