Notes:
2000 SQ FT / CADD / ARBOR- PERGOLA
5/3/2007 12:00:00 AM
1. 5-B CONSTRUCTION
2. STRUCTURE MUST WITHSTAND 90 MPH 3 SEC. GUST IBC 2003 SECTION 1609.
3. CONSTRUCTION MUST COMPLY WITH IRC 2003, 1BC 2003.
4. WORK MUST BE FIELD TESTED AND FIELD APPROVED BY CITY INSPECTOR.
5. PIER INSPECTION REQ'D.