Notes:
1-22-07 JM
1. subject to field approved inspections.
2. all construction methods shall comply with IRC 2003.
3. a pier inspection is req'd.
4. floor joist/ceiling joist shall be red cedar or treated wood product.
5. separate electrical permit will be req'd.
6. windows within 2' of any door shall be tempered.
7. based upon drawings a separate engineer shall perform an approved frame inspection before calling for a city inspector to do an additional frame inspection.
180 SQ FT, SADD / SUN ROOM