Notes:
256 SQ FT, SALT / ARBOR
11/20/2006 12:00:00 AM
1. Inspections req'd.
plbg. rough
slab
plbg. top out
2nds
insulation
drywall
electrical final- no meter involved
plbg. final--no meter involved, this will involve gas shutoff by utility and additional pressure test by city inspector
building final
2. 2'x6' plbg. walls req'd.
2a. install mechanical exhaust fan in bathroom or window.
3. all construction must comply with IRC 2003, see attached framing span chart. plbg. must comply with IPC 2003 and IRC 2003 chptrs. 26 thru 32
4. do not change direction of water drainage.
5. 6'x6' bathroom exterior walls only area to be covered in cedar, meeting the req'ment. of less than 120 sq.ft. per zoning ordinance Article 4, Sect.