Notes:
1- CONTINGENT UPON COMPLIANCE WITH BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2- REVISE PLACEMENT OF DOORS #2029, 2030, 2042 & 2156A AS PER MARKED PLAN (DWG A1.01).
3- SEE DWGS A2.01 & A2.02 FOR SUGGESTED REARRANGEMENT OF TOILET'S SPACE LAYOUTS AND FOR REQ'D CLEARANCE AT NEARBY PATIENT'S ROOM DOORS.
4- VERIFY DOORS AT EXISTING ELECT'L ROOMS FOR OUTWORD SWING AND PROPER RATING AS REQ'D.
5- ENCLOSED SPACE BEHIND THE CONCIERGE TO REMAIN TEMPORARILY 'OFF-LIMITS' TO PUBLIC AND HOSPITAL WORKERS AND PROVIDED WITH ACCESS DOOR FOR INSPECTIONS AND BLDG MAINTAINANCE NEEDS ONLY. SPACE IS ENCLOSING PORTION OF A ROOF (OVER THE 1ST FL. IMAGING FACILITY) WHICH IS NOT STRUCT'LLY ADEQUATE FOR A FLOOR. (SINCE THE SPACE BELOW IS TO REMAIN UNDISTURBED, DESIGN FOR SPECIAL RESTRUCTURING IS NECESSARY TO BE SUBMITTED, UNDER SEPARATE PERMIT APPLICATION, IN CASE THE SPACE IS TO BECOME AN OCCUPIABLE ROOM).
6- ANY ELECT'L OR ELECTRONIC FLOOR OUTLET MUST BE INSTALLED USING APPROVED FIRE RATED POKE-THRU DEVICE AS REQ'D. ALL PENETRATIONS MUST BE FIRE SEALED AS PER APPROVED UL-LISTED DESIGN AND ALL DUCTS' RATED PENETRATIONS TO BE PROVIDED WITH APPROVED FIRE/SMOKE COMBINATION DAMPERS, UNLESS OTHERWISE PERMITTED BY INSPECTORS IN SPECIFIC CASES.
7- PENDING SUBMITTAL OF IECC LIGHTING AND MECH'L ANALYSIS REPORTS.
8- NO X-RAY EQUIPMENT OR FACILITY HAS BEEN DECLARED OR PLANNED FOR THIS 2ND FL. EXPANSION, THEREFORE NOT INCLUDED IN THIS PERMIT.
9- SUBJECT TO ADDITIONAL REQUIREMENTS FROM M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
***CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
REFER TO APPROVED PLANS FOR NOTES.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.***
39600 SQ FT, CIFO / FRISCO MEDICAL CENTER SECOND FLOOR