Permit Info
Short Description:
*VOID*11770 SQ FT, CNEW / HOME THEATER STORE
Notes:
*VOID*11770 SQ FT, CNEW / HOME THEATER STORE
7/19/2006 12:00:00 AM
Comments and requirements;
1. The proposed plan for home theater is identical with the previous approved shell building plan with a permit # B05-2657, except for Sheet M1.0 and ME 1.0 that needs to be reviewed. Therefore plans are approved based on approved shell building plans with permit # B05-2657.
2. Conformance with approved site, facade, and landscape plans required.
3. Double check backflow device, pressure regulating heads, rain and freeze sensors required on irrigation system.
4. Structural concrete and steel requires lab control inspection with reports forwarded to building department.
5. Licensed subcontractors must be registered with the city of frisco before beginning any work.
6. Emergency illumination required on exterior side of required exit doors.
7. Site lighting conformance with lighting and glare standards must be verified by engineer prior to issuance of C.O.
8. Tenant finish out requires separate permit and documentation, Submit plans and documentations for tenant-finish out.
9. Required documents in the commercial packet shall be submitted.
Parcel Info
City/State/Zip:
FRISCO, TX,
Subdivision:
COMBS, STEPHEN
|
APPLICANT | ABSTRACT CONST CO. | (469)385-9700 | | 11157 ABLES LN | DALLAS, TX 75229 |
OWNER | THE MODY GROUP | (713)772-6200 | mihir@hometheaterstore.com | 6808 HORNWOOD DR | HOUSTON, TX 77074 |
CONTRACTOR | ABSTRACT CONST CO. | (469)385-9700 | | 11157 ABLES LN | DALLAS, TX 75229 |
ELECT. CTR. | TBD | ()- | | | |
MECH. CTR. | NONE | ()- | | | |
GEN. CONTR. | ABSTRACT CONST CO. | (469)385-9700 | | 11157 ABLES LN | DALLAS, TX 75229 |
PLUM. CONT. | TBD | ()- | | | |
|
MISCELLANEOUS PLUMBING FEES |
$99.00
|
|
COMMERCIAL ELECTRIC FEE |
$490.80
|
|
COMMERCIAL BUILDING PERMIT FEE |
$3,764.04
|
|
Total Fees |
Charged: $4,353.84
Balance Due: $4,353.84
|
There are currently no inspections on this record.
|
COMMERCIAL REVIEW | PPB | Approved as | 7/18/2006 | 7/19/2006 | |
More Info
|
ELECTRICAL REVIEW | Ginny Queen | Approved | 7/18/2006 | 7/21/2006 | |
More Info
|
INITIAL REVIEW | MBW | Pending | 7/18/2006 | 7/18/2006 | |
More Info
|
MECHNICAL REVIEW | TW | | 7/19/2006 | 7/20/2006 | |
More Info
|