Notes:
2984 AC, 3466 SF, SFR / 2 STORY
7/17/2006 12:00:00 AM
01. ENERGY STAR / GREEN BUILDING.
02. COMPLIANCE WITH THE 2003 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
12. INTERIOR BEAMS=10" X 30" D.
PERIMETER BEAMS=10"W X 36"D.
25. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
49. INSPECTIONS, TESTING, COMPONENT VERIFICATION AND FINAL HERS SCORE BY THE THIRD PARTY RATER PROVIDING THE REM-RATE REPORT.
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
2ND FLOOR: 4 BEDROOMS, 2 BATHS, MEDIA AND GAME ROOM.
THIS PERMIT DOES NOT INCLUDE AN OPTIONAL COVERED PATIO.