Notes:
5219 AC, 6430 SF, SFR / 2 STORY
6/15/2006 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2006 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
PERIMETER BEAMS=10"W X 36",
INTERIOR BEAMS 10" X 30".
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
2ND FLOOR: 3 BEDROOMS, 2 BATHS, MEDIA AND GAME ROOM WITH WET BAR AND TWO LARGE ATTIC SPACES.