Notes:
3874 AC, 4504 SF, SFR / 2 STORY
5/31/2006 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2006 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
08. BEAMS=10"W X 24"D.
26. TEMPERED GLASS REQ'D AT MASTER BATHTUB WINDOW.
31. SIDING OVER MASONRY AT SECOND STORY NOT ALLOWED.
46. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
59. INCLUDED IN THIS PERMIT PACK IS A DRAWING AND SPECIFICATION OF THE REQUIRED BARRIER-FREE RAMP.
1st FLOOR REQUIRES 100% MASONRY.
2nd FLOOR: 4-BED ROOMS, 2-BATHS, MEDIA AND GAME ROOM.