Notes:
1- CONTINGENT UPON P+Z & CIVIL ENGG APPROVALS OF FINAL SITE PLAN, P+Z ACCEPTANCE OF EXTERIOR ARCHITECTURAL DESIGN (INCLUDING FINISH MATERIALS), COMPLIANCE WITH BLDG CODE & LOCAL REQUIREMENTS, PERTINENT LEGISLATIONS AND REVIEW COMMENTS.
2-LOCATE ENCLOSED WASTE CONTAINMENT AREA TO FACE LESS ON STREET, HAVING FULL WIDTH APPROACH & EASIER EXIT MANUVERING FOR WASTE TRUCK, AS SUGGESTED BY REVIEW COMMENTS OR AS PER OTHER APPROVED ARCHITECT'S PROPOSAL. ENCLOSURE TO BE MIN. 3' FROM NON-COMBUSTIBLE BLDG WALL, UNLESS PROTECTED BY APPROVED 2 HR FIRE-RATED SEPARATION. FINAL SOLUTION MUST MEET THE APPROVAL OF THE ENVIRONM'L SVCS DEPT. (972-335-5519) PRIOR STARTING ANY CONSTRUCTION.
3- EXTERIOR DOORS AT END OF CLASSROOM PODS MAY OMIT ENTRY VESTIBULES ONLY IF THE ENTERED SPACE IS KEPT AT LESS THAN 3000 SQ. FEET.
4- ALL EXITWAYS TO HAVE RATED WALLS WITH PROTECTED OPENINGS AS REQ'D. ANY GLAZING INCLUDED IN RATED WALLS MUST BE RATED ACCORDINGLY. DUCT'S RATED PENETRATIONS MUST BE PROVIDED WITH FIRE/SMOKE COMBINATION DAMPERS UNLESS APPROVED OTHERWISE BY INSPECTORS.
5- DOORS D141A&B AT THE PRE-FUNCTION LOBBY TO BE TWO-WAY EXIT TYPE AS REQ'D.
6- ALL FOOD RELATED AREAS AND EQUIPMENT SUBJECT TO HEALTH & FOOD SAFETY DEPT'S REVIEW AND APPROVAL.
7- SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
(5/11/2006 10:51 JS) (4/27/2006 13:51 JRS)
PENDING SPEC SHEET FOR PROPOSED GREASE INTERCEPTOR AND CALCULATIONS THAT FLOW RATE WILL NOT EXCEED RATED AMOUNT.
(5/11/2006 10:20 JS)
SPOKE TO ERIN TODAY. SHE WILL RE-BRING IN G.I. INFO 05/12/06 AM.
(5/11/2006 10:20 JS)
PLEASE COMPLY WITH HEALTH ORDINANCE # 00-03-19 AND SMOKING ORDINANCE #00-12-12.
(5/11/2006 10:51 JS)
G.I. SPECS BROUGHT IN TODAY. APPROVED.
(5/19/2006 13:08 SLC) LICENSED CONTRACTORS MUST BE REGISTERED WITH THE CITY OF FRISCO PRIOR TO BEGINNING ANY WORK.
76902 SQ FT, SCHL / REBA COBB CARROLL ELEMENTARY SCHOOL