Notes:
2921 AC, 3536 SF, SFR / 2 STORY
4/8/2006 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
09. BEAMS=10"W X 26"D.
31. SIDING OVER MASONRY AT SECOND STORY NOT ALLOWED.
32. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
35. 2 X 6 PLUMBING (VENT STACK/WASTE)WALLS REQ'D.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(4/8/2006 09:35 JC)
Inspection Note : Check left elevation box-out at framing. Area vs. window box-out.