Notes:
1. 1 hr. shaft enclosure with type x gyp. bd. or 2 hr. with fire wrap
2. fully sprinkled.
3. all work subject to field app'd. inspections.
4. maintain correct clearances at electrical panel, 36" clear.
5. adding 2 ton a/c unit.
1500 SQ FT, CALT / KOLACHE DEPOT