Notes:
6943 SQ FT, CIFO / NATIONAL BREAST CANCER FOUNDATION
4/8/2006 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck( U #UL 465 tenant finish) fire caulk floor to deck.
3. 20 minute door in 1 hr. corridor.
4. tempered glass where req'd. must have rated glass at reception entry.
5. fully sprinkled.
6. all work subject to field app'd. inspections.