Notes:
6097 SQ FT, CIFO / SUNGARD SCT, INC
3/15/2006 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire caulk floor to deck.
3. 20 minute doors at 1 hr. corridor.
4. fully sprinkled.
5. all work subject to field app'd. inspections.