Notes:
3634 AC, 4063 SF, SFR / 2 STORY
2/9/2006 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
05. BEAMS=8"W X 26"D.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
33. MEDIA ROOM WITH CLOTHES CLOSET MUST HAVE OPERABLE WINDOW.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
59. INCLUDED IN THIS PERMIT PACK IS A DRAWING AND SPECIFICATION OF THE REQUIRED BARRIER-FREE RAMP.
(2/9/2006 16:16 JC)
Grade Beams : (2) #5 Rebar in all perimeter beam bottoms. Window box-outs are not flush with the masonry. Either box-out or remove the siding. Correct future plans.