Notes:
10000 SQ FT, CIFO / DAVID'S BRIDAL (finish-out only)
2/14/2006 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire seal floor to deck.
3. 20 minute door req'd. at electrical rm.
4. Need combo. high/low drinking fountain or a high drinking fountain with electric bottled water cooler.
5. fully sprinkled.
6. construction subject to field app'd. inspections.
7. 1 hr. separation w/20 minute doors between storage & sales, seamstress, sales, office area.
8. 1 hr. corridor at rear exit w/ 20 minute doors.