Notes:
4523 SQ FT, CIFO / HALFF & ASSOC
2/7/2006 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire seal floor to deck.
3. Need high/low drinking fountain, or provide letter indicating installation of electric bottled water cooler.
4. fully sprinkled.
5. construction subject to field app'd. inspections.
6. tempered windows at entry.
7. IECC 2001 802.3.5 over 3000 sq. ft. of open office area requires a vestibule, option is 2 self-closing doors to separate office areas. add exit lighting at these areas.