Notes:
1100 SQ FT, CIFO / IN2PARTY
1/31/2006 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. install floor mounted mop sink.
3. 1 hour fire/smoke construction w/ 6” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire safe floor to deck.
7. Need combination high/low drinking fountains.
8. door at restroom must be changed to swing out to comply with ada and tas.