Notes:
3334 AC, 3875 SF, SFR / 2 STORY
1/28/2006 12:00:00 AM
01. ***ENERGY STAR***
02. COMPLIANCE WITH THE APRIL 2003 CONTRACTOR GUIDELINE REQ'D
03. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS
12. BEAMS=10"W X 30"D.
23. GARAGE MUST BE A MIN. 18'W X 20'D CLEAR SHEET ROCK TO SHEET ROCK.
29. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
31. SIDING OVER MASONRY AT SECOND STORY NOT ALLOWED.
42. PROVIDE SOIL MOISTURE TREATMENT DOCUMENTATION PRIOR TO STARTING CONSTRUCTION.
49. SAME 3RD PARTY RATER MUST DO ALL INSPECTIONS & TESTING OF SUPPLY AND EXHAUST DUCT(S) AND DAMPERS TO MEET ENERGY STAR/GREEN BLDG REQUIREMENTS..
50. CSST GAS PIPING ALLOWED - SEE INFO SKETCH IN LOBBY AND (OR) ORDINANCE(S) 03-07-58 & 03-07-59.
54. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
(1/28/2006 10:37 JC)
1st. story masonry option required.