Notes:
3100 SQ FT, CIFO / SONA MEDSPA
1/6/2006 12:00:00 AM
1. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire seal floor to deck.
2. 20 minute doors with 1 hr. corridors.
3. maintain 1 hr. corridor with fire/smoke dampers installed where ducts penetrate 1 hr. wall assembly.
4. doors to open away from lease space at entry.
5. no vestibule req'd.