Notes:
1435 SQ FT, CIFO / SPORT CLIPS
1/8/2006 12:00:00 AM
1. valid 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire seal floor to deck.
3. Need to maintain correct ADA restroom and TAS compliance after installation of mop sink.
4. add exhaust fan at dryer location. see dwg. notes.
5. construction subject to app'd. field inspections.
6. fully sprinkled.
7. restroom finishes---wall--easily cleanable surface and non-absorbent (floor--vct with integrated cove bas.