Notes:
1500 SQ FT, CIFO / BANG DRAPERY
12/10/2005 12:00:00 AM
1. 1 hour fire/smoke construction w/ 6” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire caulk floor to deck.
2. Need high/low drinking fountain---ADA compliant, location is optional.
3. Need mop sink.
4. based on occupant load, one restroom is all that is req'd.
5. fully sprinklered.
6. construction subject to field inspection approval.
12-10-05 3:40 JM)
*All duct work to be sealed with mastic, welds, or gaskets; Tapes not accepted.
*All exhaust fans to terminate outside of the bldg.
*Fresh air intakes to be 10 ft. away or 2 ft. below exhaust gas openings & require dampers to close intake when not in use.
*Mech. Contractor to be responsible for duct sizing and load calculation.
*Mech. Contractor to verify fresh air intake per IMC 403 & table 403.3
*Mech. Installation to comply with 2000 IECC and supplements.
*Rigid duct required with 6 ft. (R-6) flex duct connector allowed between rigid duct and diffuser.
*Set back T-Stats required for each zone.
*Smoke detectors/dampers to be installed per chapter 6 of IMC.
*Subject to field review and inspection.
CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
LICENSED SUBCONTRACTORS MUST BE REGISTERED WITH THE CITY OF FRISCO BEFORE BEGINNING ANY WORK. SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD INSPECTIONS.
REFER TO APPROVED PLANS FOR NOTES.
ALL SUBCONTRACTORS MUST VALIDATE AND OBTAIN CURRENT REGISTRATION WITH THE CITY PRIOR TO START OF PROJECT.