Notes:
3744 SQ FT, CIFO / ADMINISTAFF
12/2/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck.
3. 20 minute door, and 1 hr. corridor
4. tempered windows at reception.
5. fully sprinklered.
6. all work subject to field inspection approval.