Notes:
2669 SQ FT, CIFO / MTI*******SEE CO05-0107*************
11/17/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to ceiling, fire caulk floor to ceiling with all wall penetrations at new demising walls.