Notes:
1319 SQ FT, CIFO / DRIVING SCHOOL OF NORTH TEXAS
11/20/2005 12:00:00 AM
1. valid 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire caulk floor to deck.
7. Need high/low drinking fountain.