Notes:
11-29-05 jm)
IBC 1004.3.2.3 EXCEPTION 3
1. provide additional exit due to a distance of more than 50' to exit
2. fully sprinklered
3. subject to field inspection approval
CONTINGENT UPON COMPLIANCE WITH REVIEW COMMENTS, CODE REQUIREMENT AND PERTINENT LEGISLATIONS.
REFER TO APPROVED PLANS FOR NOTES.
SUBJECT TO M.E.P. REVIEWS, FIRE MARSHAL AND FIELD
(1/8/2006 10:00 JM)---addendum 2687 sq. ft. SBB management
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to ceiling--( per Steve C.) and fire seal floor to deck.
3. 20 minute door at 1 hr. corridor.
4. subject to approved field inspection.
5. fully sprinkled.
6. provide fire extinguisher at dead end corridor.
4610 SQ FT, CIFO / SPEC SPACE B***REFER TO B06-0089****