Notes:
1490 SQ FT, CIFO / LIBERTY MUTUAL
10/28/2005 12:00:00 AM
1. 1 hour fire/smoke connection to mullion.
2. 1 hour fire/smoke construction w/ 3 5/8” metal studs w/ 5/8” type X gypsum on both sides up to deck, fire seal floor to deck.
3. 20 minute door with 1 hr. frame at reception entry.
4. glass at entry reception area must be rated, this is a one hour corridor.
5. fully sprinklered.