Notes:
9-30-05 jm) on hold items 1 thru 3
1. missing elevation dwg's.
2. need roof hatch detail.
3. submit door schedule for approval.----THESE ITEMS ARE COMPLETE
9-30-05 jm)
a. sht. a-1.1 20' minimum between bldgs. or provide 1 hr. fire/smoke wall assembly.
b. sht. a-1.1 revise dumpster detail to match city requirements.
c. no kitchenette shown on plans, tenant to use vending machines, per Jeff Lanier
d. mech. storage & fire riser room shall be one hour u465 rated with 45 min. door & 1 hr. rated door.
(2/17/2006 17:04 MBW) CHANGED TO BUILDING #7 FROM #18 PER OWNER REQUEST.
8545 SQ FT, CIFO / AMBERTON UNIVERSITY